10km Holiday Traffic Jam at Gotthard Tunnel
Post-Christmas travel causes significant delays at Switzerland's Gotthard tunnel, with waiting times exceeding 80 minutes as holiday travelers head south.

Key Takeaways
- A 10-kilometer traffic jam formed at the Gotthard tunnel's north portal
- The traffic jam occurred between Erstfeld and Göschenen in canton Uri
- Swiss Federal Railways (SBB) increased train services to winter destinations
By The Numbers
They Said
"The slowdown in traffic between Erstfeld and Göschenen in canton Uri was due to traffic overload"